At a glance
District 65 will present roughly $20 million in reductions on October 13, and administrators have said programs the law does not require are under review (Evanston RoundTable, Sept. 29). Early childhood education at the Joseph E. Hill Early Childhood Center (JEH) is one of the programs many families are worried about.
It is clear that painful cuts are coming to slow our structural deficit. That doesn’t mean that community members should not speak up and advocate for the issues that matter most to them. Our view is that early childhood belongs near the bottom of the cut list, for four reasons:
- Part of it is required by federal law. Preschool special education for 3 to 5 year olds with disabilities must be provided no matter what the budget says.
- Much of it is funded by grants. Federal Head Start and state Preschool for All dollars cover a large share, so the savings to D65 from a cut may be far smaller than the program’s total budget.
- The research on high-quality programs is strong, especially for children who arrive at kindergarten furthest behind. Quality matters a great deal, and we elaborate more on that below.
- Gaps that show up on the first day of kindergarten tend to persist. D65’s own data shows this, and those gaps drive costs in later grades.
The single most useful thing community members can ask for: the net cost to D65 of each early childhood program after grants, before any cut is decided. That net cost estimate must reflect any anticipated new costs to meet the for 3 to 5 year olds with disabilities via external collaboration or other alternatives..
Where things stand
The administration will propose a financial sustainability package at the October 13 board meeting, with board action expected in November. The package targets about $20 million in reductions by fiscal year 2028 (FY28, the 2027-28 school year) and two more school closures. Administrators have also said they are examining non-mandated programs, meaning programs that no state or federal law requires D65 to run (The Record, Sept. 18).
No specific early childhood cut has been announced. Evanston Now reported that preschool is not necessarily on the reduction list, yet 10 of 30 speakers at the September 28 board meeting raised it (Evanston Now). The idea to close JEH was raised in public listening sessions in September, sometimes accompanied with the suggestion to move the programming to neighborhood schools. Our FAQ summarizes the memo the board received from the administration last year, covering their analysis of this option (starting on page 11).
What JEH is
Joseph E. Hill Early Childhood Center serves children from birth to age 5 (JEH home page). It also houses general administrative staff and the facilities for the school board meetings. The district’s September 2025 SDRP III scenarios memo lists the early childhood center at 276 students, and the building has capacity for about 404, so it is roughly 68% full (D65 SDRP III School Scenarios Overview Memo, Sept. 29, 2025; Thrive65 FAQ). The JEH website gives a higher figure of about 400 children served each year, which may count children enrolled at any point during the year; ask the district which count is current (JEH Early Childhood Center page). The Family Center in the same building runs home visiting and an infant-toddler program for children from birth to age 3, at no charge to families (JEH Family Center page). The school reports 37 languages spoken among its families and a staff-to-student ratio of 1 to 4 (JEH home page).
Enrollment is not open to all comers. Children qualify based on family income or a developmental risk factor, such as a possible need for special education (D65 Report on Black Student Achievement, 2016, p. 10).
What is required, and what is optional
“Non-mandated” does not describe JEH as a whole. JEH blends several programs, each with its own funder and rules, often in the same classrooms (JEH Early Childhood Center page). One of them is required by federal law.
| Program | Ages | Who it serves | Main funding | Required of D65? |
|---|---|---|---|---|
| Early Childhood Special Education (ECSE) | 3 to 5 | Children with disabilities who have an IEP | State grant plus federal IDEA dollars and local funds | Yes. Federal law (IDEA) requires it |
| Head Start | 3 to 5 | Children from families with low incomes | Federal grant (U.S. Dept. of Health and Human Services) | No |
| Preschool for All (PFA) | 3 to 5 | Children with risk factors, mostly from families with low incomes | State Early Childhood Block Grant | No |
| Early Head Start and Doorway to Learning | Birth to 3 | Infants and toddlers of eligible working families | Federal Early Head Start, state grant, state child care assistance (CCAP) | No |
| Prevention Initiative (Family Center) | Birth to 3 | Families with infants and toddlers, mainly through home visits | State Early Childhood Block Grant | No |
Sources: JEH Early Childhood Center page; JEH Family Center page; D65 early education enrollment page.
Why the required part matters for the optional parts
The federal Individuals with Disabilities Education Act (IDEA) requires states to make a free appropriate public education available to every child with a disability from age 3. It also requires a “Child Find” system to locate and evaluate children who may need services (ECTA Center, Part B Section 619 overview). Every state, Illinois included, mandates these preschool services.
IDEA also expects children with disabilities to learn alongside peers without disabilities whenever possible. Federal guidance says the first placement a team should consider is the regular public preschool program the child would otherwise attend (ECTA Center, Section 619 overview PDF). At JEH, the Head Start and Preschool for All classrooms are those regular settings.
This means cutting the optional programs does not make the required obligation go away. It removes the inclusive classrooms where many children with IEPs are served, and D65 would still have to place those children somewhere appropriate. In 2021, 33% of JEH students received special education services (Daily Northwestern, Feb. 2022).
What the research shows
High-quality early learning has some of the strongest long-term evidence in education policy, and one rigorous study shows that a poorly designed program can do harm. Both facts belong in the conversation.
The biology comes first. Harvard’s Center on the Developing Child reports that more than 1 million new neural connections form every second in a child’s first few years, and that it is easier and cheaper to build strong foundations early than to repair them later (Harvard Center on the Developing Child, InBrief).
| Study | Who and when | What it found | Limits to keep in mind |
|---|---|---|---|
| Boston public pre-K lotteries (Gray-Lobe, Pathak, Walters, 2023) | About 4,000 Boston 4-year-olds, 1997 to 2003, admitted by lottery | Attending raised on-time college enrollment by 8.3 percentage points; raised high school graduation; reduced juvenile incarceration | No detectable effect on state test scores, which is why short-term test data can mislead |
| Head Start, national (Bailey, Sun, Timpe, 2021) | Children reached as Head Start rolled out county by county, 1965 to 1980 | About 0.65 more years of schooling and higher adult economic self-sufficiency | Older cohorts; today’s program and alternatives differ |
| Chicago Child-Parent Centers (Reynolds et al., 2002) | 1,539 Chicago children born in 1980; program run inside public schools with heavy parent involvement | $7.14 returned to society per $1 spent by age 21; less remedial education, juvenile delinquency, and child maltreatment | Not a lottery study; groups were matched, not randomized |
| North Carolina Smart Start and More at Four (Muschkin, Ladd, Dodge, 2015) | County-level funding across North Carolina over 13 years | Together, 39% lower odds of special education placement in 3rd grade | Measures community-wide funding effects, not individual children |
| Perry Preschool (Heckman et al., 2010) | Small randomized trial, Michigan, 1960s | 7% to 10% annual return to society | Very small sample, one site, intensive model |
| Tennessee Voluntary Pre-K (Durkin et al., 2022) | 2,990 children from families with low incomes, randomized by wait list | Negative effects by 6th grade on test scores, discipline, attendance, and special education referrals | The only large randomized study of a statewide program; researchers point to low classroom quality and overly academic instruction (Hechinger Report) |
What this adds up to:
- Long-run gains often appear even when test-score gains fade. Boston and the national Head Start study both show this pattern.
- Program design and quality decide the outcome. The Chicago centers, which most resemble a public school district program with strong family engagement, produced large returns. Tennessee shows that preschool done poorly is not a safe bet.
- The case for protecting early childhood is also a case for evaluating it. Thrive65 supports asking D65 to show how JEH performs, rather than assuming any preschool is good preschool.
What D65’s own data shows
D65’s most detailed public analysis of early childhood and kindergarten readiness is a 2016 report by its Office of Research, Accountability and Data (D65 Report on Black Student Achievement, April 2016). The data is now ten years old, so treat it as a pattern to check, and ask the district for current figures. Its main findings:
- Readiness gaps are large at kindergarten entry. In 2015, 34% of entering Black kindergartners and 64% of entering white kindergartners met D65’s early literacy readiness benchmark, a gap that held steady from 2012 to 2015 (pp. 8, 12).
- Income explains part of the gap, not all of it. Among families with lower incomes, the gap was 20 percentage points; among higher-income families, 8 points (p. 12).
- Where children start shapes where they go. From kindergarten to 3rd grade, the reading gap narrowed among children who arrived kindergarten-ready and widened among those who did not (pp. 14-15). In grades 3 to 8, the gap present at kindergarten entry was maintained (p. 17).
- JEH served a large share of each class. D65 preschool programs served 246 children, 28.4% of the 2015 kindergarten class (p. 7).
- JEH results were encouraging but not conclusive. Among Black children from lower-income families, 30.3% of JEH alumni were kindergarten-ready versus 26.3% of those who attended other pre-K. The report itself cautions this is not enough to estimate JEH’s effect, because JEH enrolls children with higher needs by design (p. 10).
Later reporting points in the same direction. A D65 early childhood task force found kindergarten readiness lower for Asian, Black, and Latino children than for white children, and found that D65’s Head Start, Early Head Start, and Preschool for All programs made up 21% of the child care capacity in Evanston and Skokie (Evanston Now). In September 2026, board member Maria Opdycke said the picture of racial achievement gaps has not changed since she began studying it in 2016 (Evanston Now, Sept. 29).
What this means for the budget: the gaps D65 is still trying to close in grades 3 to 8 are already visible on the first day of kindergarten. Early childhood is one of the few places the district can act on them before they compound.
Who would feel a cut most
Because JEH enrolls by need, a cut here lands on families with the fewest alternatives. That is a description of how the program is built, and it applies to families of every background who meet the criteria.
- Working parents with lower incomes. The infant-toddler program requires families to qualify for state child care assistance, which is for low-income working parents and requires full-time approval (D65 early education enrollment page). Losing a slot can mean losing a job or a shift.
- Children with disabilities and developmental delays. A third of JEH students received special education services in 2021 (Daily Northwestern). JEH is also where many families get a child evaluated before kindergarten. At the September 28 meeting, a parent asked how families will get children evaluated before age 5 if programs change (Evanston RoundTable, Sept. 29).The district would still have to have an evaluation team because they are obligated under Child Find to evaluate children ages 3-5 to see if they qualify for special education services
- Families still learning English. JEH reports 37 home languages (JEH home page) and employs bilingual pre-K teachers (JEH staff directory). Early exposure to school routines and language support can ease the move to kindergarten for these children.
- Families without stable housing. Federal Head Start rules currently require programs to identify and prioritize children experiencing homelessness; a pending federal proposal would remove most of those procedures (SchoolHouse Connection). A district program may become one of the few dependable doors for these families.
- Staff. The Family Center and its infant-toddler center alone employ 20 people, 17 with at least a bachelor’s degree (JEH Family Center page). JEH also employs paraprofessionals, speech-language pathologists, social workers, and bilingual teachers (JEH staff directory). Once a specialized team like this disperses, it is slow to rebuild.
For some families this is personal in a way a budget line cannot show. One father told the board the services his son received at JEH were “not an abstract budget item” (Daily Northwestern, Sept. 30).
The fiscal case
It is clear that cuts are needed. D65 adopted an FY27 budget with a $5.1 million operating deficit that leaves 77.5 days of cash on hand, below the board’s 90-day goal (Evanston RoundTable, Sept. 29). The question for early childhood is how much a cut would save, net of everything that comes with it.
1. Gross cost is not net savings. Head Start is federally funded, and Preschool for All and early childhood special education come through state grants (JEH Early Childhood Center page). When D65 became a direct Head Start grantee, its five-year award was $13.25 million, or $2.65 million a year (Evanston Now); the current award should be confirmed. Cutting a grant-funded program saves D65 only its local share, and the grant dollars leave Evanston. A community member raised this same question in a September guest essay: what does Head Start cost local taxpayers after federal funding and reimbursements (Evanston RoundTable, Sept. 21)? That number should be public before any decision.
2. Some costs move instead of disappearing. D65 must serve preschoolers with disabilities either way (see above). A JEH special education teacher told the board that neighborhood schools lack facilities that state and federal funders require, such as bathrooms next to each classroom (Evanston RoundTable, Sept. 29). Relocation could require building work, added transport, and specialists who travel between sites. Those costs belong in any comparison. The district reached the same conclusion in 2025, warning that splitting the program across schools risks increasing special education costs (D65 SDRP III School Scenarios Overview Memo, Sept. 29, 2025).
3. Enrollment drives grant dollars. Head Start funding is tied to enrollment, and programs must stay at 97% of funded enrollment. In late 2025, D65’s partner site at the Infant Welfare Society was at about 87%, and the district’s annual grant payment was delayed (Evanston RoundTable, Dec. 2025). If busing is cut and fewer families can get their children to JEH, enrollment could fall and take grant funding with it.
4. Early learning can lower later costs. In North Carolina, early childhood funding cut the odds of 3rd-grade special education placement by 39%, and special education costs nearly twice as much per student as a regular classroom (Duke University). The Chicago Child-Parent Centers reduced remedial education, among other public costs (Reynolds et al., 2002). Those savings arrive years later, which is exactly why they are easy to overlook in a one-year budget.
5. The ground is shifting in Washington and Springfield. A federal proposal released in August 2026 would rewrite Head Start’s performance standards, including capping administrative costs at 5% instead of 15%, making parent committees optional, and requiring English-only instruction. Public comments close October 6, 2026 (First Five Years Fund FAQ). Illinois, by contrast, maintained Early Childhood Block Grant funding in its FY27 budget (Illinois Department of Early Childhood). Dismantling local structures now, while federal rules are in flux and state support is holding, risks losing capacity that would be expensive to rebuild.
Fair points, considered with additional context
Neighbors who question early childhood spending are asking reasonable things. These are the points we hear most, with what we think the evidence supports.
Preschool isn’t D65’s core job: For general preschool, that is accurate: Illinois does not require districts to run it. Preschool special education is required, though, and D65 has chosen to serve children with and without disabilities together, as federal law encourages. The core K-8 job also gets harder and costlier when children start kindergarten behind.
Preschool gains fade out: Test-score gains often do shrink by 3rd grade. The Boston and national Head Start studies found long-run gains in graduation, college, and adult earnings even so (Gray-Lobe et al.; Bailey et al.). The Tennessee results are a fair warning that a weak program can leave children worse off, which is why we ask for evaluation alongside protection.
D65 has funded early childhood for years and the gaps haven’t closed: This deserves a direct answer. Board member Maria Opdycke has urged the board to consider cutting programs that have not improved achievement (Daily Northwestern, Sept. 30). That standard is reasonable and should apply to every program, including JEH. D65’s own 2016 analysis said its data could not isolate JEH’s effect (2016 report, p. 10), though that information is over 10 years old. The right response is a current, careful comparison, since a program that enrolls the highest-need children will always look weaker on raw averages, and the details are critical to understanding where the challenges and opportunities are.
Preschool should move into the elementary schools to fill empty classrooms: The district has already studied this. In its September 2025 SDRP III scenarios memo, the administration declined to model spreading preschool classrooms across neighborhood schools, for three stated reasons: 1) the program runs on grants plus general funds, so expanding it would raise costs in the short term; 2) each site would need renovation, including safe outdoor play space, stronger ventilation for asthma and allergies, and child-sized sinks and toilets; and 3) breaking up the team of teachers, clinicians, and leaders risks raising special education costs and lowering quality (D65 SDRP III School Scenarios Overview Memo, Sept. 29, 2025). The district did model moving the 3 to 5 program into a single vacated school after a closure, located in the 5th, 8th, or 9th ward near where JEH families live, no earlier than 2027-28. It recommended keeping children at JEH, D65’s newest building (2002) and the only one rated better than “poor” on the facilities condition index. That analysis is a year old, so it is fair to ask whether it still holds under the $20 million package.
Families can use private preschool: Most JEH families qualify because of income or a child’s developmental needs, and the Family Center charges nothing for its services (JEH Family Center page). D65 programs were about a fifth of local child care capacity in the task force’s count (Evanston Now). Removing that capacity may not be absorbed easily by private providers, and the added burdens to the families should be evaluated first.
JEH has empty seats too: That is true, and we should say so. JEH enrolls about 276 children in a building with room for about 404, roughly 68% full (D65 SDRP III School Scenarios Overview Memo, Sept. 29, 2025; Thrive65 FAQ). The same efficiency standard Thrive65 applies to elementary buildings applies here. Underused space is a reason to ask how JEH could fill seats or share the building. The district’s own memo recommended stronger outreach to families about available early childhood programs.
Some other paths worth discussing: The same memo raised charging tuition to families who do not qualify for free or reduced-price lunch, as a way to address some of the program’s costs. The district said the idea needed more vetting than the SDRP timeline allowed. It deserves a fair hearing, with attention to how tuition would affect enrollment, grant eligibility, and the mix of children in classrooms.
Partnering with community agencies: D65 should also explore whether an established local provider could take over some or all of the grant-funded programs, such as Head Start, Early Head Start, and Preschool for All, so the funding and the community resource stay in Evanston while D65’s own share of the cost shrinks. Local partners already exist: D65 contracts with the Infant Welfare Society of Evanston for Early Head Start, and Childcare Network of Evanston holds its own Head Start grants (Evanston RoundTable, Dec. 2025). Evanston Cradle to Career (EC2C), a partnership of more than 40 local organizations that D65 helped found, could convene that conversation; it coordinates services rather than running classrooms, and its early childhood work is led by the Evanston Early Childhood Council (Evanston RoundTable, Aug. 2024). There is precedent at scale: New York City’s public schools stopped administering Head Start at the end of 2025, and federal officials selected new community grantees to run the programs (NYC Public Schools). Any transition would need careful planning. Grant transfers require federal and state approval, D65 would keep its legal duty to evaluate and serve preschoolers with disabilities, and families would need continuity of staff, location, and services through the handoff.
Questions to ask the board and administration
Useful in public comment, emails to board members, or the community sessions after October 13.
- What is the net local cost of each early childhood program (Head Start, Early Head Start, Preschool for All, Prevention Initiative, and early childhood special education) after federal, state, and child care assistance revenue? And how much would we estimate in outplacement costs for IDEA eligible 3-5 year old students if we eliminated our in-house programming?
- Which early childhood items are in the October 13 package, and how much outside grant money would D65 give up with each?
- If preschool moves to neighborhood schools, what would facility upgrades, transportation, and specialist coverage cost, and do the new sites meet Head Start and Preschool for All requirements? The administration’s 2025 scenarios memo said this would raise costs; does that conclusion still hold?
- If preschool busing is cut, what enrollment drop does the district expect, and how would that affect enrollment-based Head Start funding?
- How will D65 meet its federal Child Find duty to locate and evaluate children under 5, and where will children with IEPs be placed alongside peers without disabilities?
- Will the district publish current kindergarten readiness data by preschool experience, family income, disability, and English learner status? The most detailed breakdown we found is from 2016.
- How is the administration planning around the pending federal Head Start rule changes?
Talking points
Short enough for a two-minute public comment. Pick the two or four that fit you best and add your own experience; personal stories carry more weight than statistics.
- I know D65 has to make hard cuts, and I’m not asking the board to avoid them. I’m asking that early childhood be judged on its net cost after grants, which may be much smaller than its total budget.
- Preschool special education is required by federal law. Cutting the preschool classrooms around it doesn’t remove that duty; it removes the inclusive settings where many of these children learn.
- D65’s own data shows the gaps we are still trying to close in middle school are already there on the first day of kindergarten.
- Long-term studies of Boston’s public pre-K and of Head Start found higher graduation and college rates, even where test-score gains faded.
- In North Carolina, early childhood funding lowered the odds of 3rd-grade special education placement by 39%. Savings like that show up years later, which is why one-year budgets miss them.
- Quality matters. I support evaluating JEH honestly, and I’d ask the board to do that before cutting it.
- If preschool moves to neighborhood schools, please publish a full cost comparison first, including facilities, buses, specialists, and grant requirements, as well as the impact to the staff supporting these children.
- The families JEH serves qualify because of income or a child’s developmental needs. Many have few affordable alternatives.
Glossary
| Term | What it means |
|---|---|
| CCAP | Child Care Assistance Program, Illinois’ child care subsidy for working families with low incomes |
| Child Find | The federal requirement that districts locate and evaluate children who may have disabilities, starting before kindergarten |
| ECBG | Early Childhood Block Grant, the state grant that funds Preschool for All and Prevention Initiative; run by the new Illinois Department of Early Childhood since July 1, 2026 (IDEC) |
| ECSE | Early Childhood Special Education, preschool services for 3 to 5 year olds with disabilities |
| FAPE | Free Appropriate Public Education, the legal right of children with disabilities to services at no cost to the family |
| FY28 | Fiscal year 2028, D65’s budget year running July 2027 to June 2028 |
| Head Start / Early Head Start | Federal programs for children from families with low incomes; Head Start serves ages 3 to 5, Early Head Start birth to 3 |
| IDEA | Individuals with Disabilities Education Act, the federal special education law |
| IEP | Individualized Education Program, a child’s written special education plan |
| ISEL | Illinois Snapshot of Early Literacy, the assessment D65 has used to measure kindergarten literacy readiness |
| JEH | Joseph E. Hill Early Childhood Center, D65’s early childhood site at 1500 McDaniel Ave. |
| NPRM | Notice of Proposed Rulemaking, a draft federal rule open for public comment |
| PFA | Preschool for All, Illinois’ state-funded preschool program |
Sources
Retrieved October 5, 2026. Evanston RoundTable pages block automated access, so those were reviewed through search excerpts; verify quotes against the full articles before publishing.
D65 and JEH
- JEH home page
- JEH Early Childhood Center (ages 3-5)
- JEH Family Center (birth to 3)
- JEH staff directory
- D65 early education enrollment page
- D65 Office of Research, Accountability and Data, Report on Black Student Achievement in District 65, April 25, 2016
- D65 Administration, SDRP III School Scenarios Overview Memo, Sept. 29, 2025, sections on the Early Childhood Center, JEH Early Childhood, and JEH Administrative Offices
- Thrive65 Coalition FAQ, “Why not close JEH and put early childhood education in each school?” (source of the 404-seat capacity figure)
Local news
- Evanston RoundTable, District 65 approves budget with $5.1 million deficit, Sept. 29, 2026
- Evanston RoundTable, Guest essay: Questions for school administrators as cuts loom, Sept. 21, 2026
- Evanston RoundTable, District 65 annual Head Start grant not paid by feds, Dec. 11, 2025
- The Record, 2 more District 65 schools may close as part of $20-million budget cut, Sept. 18, 2026
- Daily Northwestern, D65 parents urge community advocacy, Sept. 22, 2026
- Daily Northwestern, Community members share priorities at feedback meetings, Sept. 25, 2026
- Daily Northwestern, The Weekly audio recap, Sept. 27, 2026
- Daily Northwestern, D65 board reviews achievement gaps, Sept. 30, 2026
- Daily Northwestern, Early childhood centers reduce pre-K disparities, Feb. 1, 2022
- Evanston Now, The littlest lobbyists: Save D65 preschool
- Evanston Now, Contemplating cuts
- Evanston Now, Racial gap stuns District 65 leaders
- Evanston Now, D65 board to review kindergarten readiness data
- Evanston Now, District 65 gets Head Start grant
Law and policy
- ECTA Center, Part B Section 619 of IDEA and Section 619 overview PDF
- First Five Years Fund, FAQ on the 2026 Head Start NPRM
- SchoolHouse Connection, Proposed Head Start rule and children experiencing homelessness
- Illinois Department of Early Childhood, FY27 budget announcement
- Illinois Department of Early Childhood, Preschool for All
Research
- Harvard Center on the Developing Child, InBrief: The Science of Early Childhood Development
- Gray-Lobe, Pathak, Walters, The Long-Term Effects of Universal Preschool in Boston, Quarterly Journal of Economics, 2023
- Bailey, Sun, Timpe, Prep School for Poor Kids, American Economic Review, 2021
- Reynolds, Temple, Robertson, Mann, Age 21 Cost-Benefit Analysis of the Title I Chicago Child-Parent Centers, 2002
- Muschkin, Ladd, Dodge, Impact of North Carolina’s Early Childhood Initiatives on Special Education Placements in Third Grade, 2015 (Duke summary)
- Heckman et al., The Rate of Return to the HighScope Perry Preschool Program, NBER, 2009/2010
- Durkin, Lipsey, Farran, Wiesen, Effects of a State Prekindergarten Program at Sixth Grade, Developmental Psychology, 2022
- Hechinger Report, Behind the findings of the Tennessee pre-K study